We are direct manufactures for Sliding Homes and all other building material to built it
Our steel frame kits have a lifetime warranty.
Pre-engineered HDG steel stud frame walls & roof panels (AS 4680)
Increasing efficiency, precision, productivity and affordability
Decreasing a 20 percent cost advantage and a time
No Concrete slab required, just Pires.
50-80 percent reduction in waste and embodied carbon over standard construction.
Embracing new technologies
Advancing the Australian manufacturing sector
You can also choose to have a brick finish on the outside.
Quick turnaround within 90 days on your site.
Save on Mortgage
Just need to have your piers ready to add the sliding house on and hook water and sewer and electrical to mains.
Information will be available soon.